From subgrade to the last line of paint.

We build roads, streets and sidewalks from subgrade to final surface: earthworks, base courses, asphalt paving with our own pavers and rollers, kerbs, sidewalks, road furniture, signage and markings, fed by our own asphalt plants and haul fleet.
CR 421010 (construction of roads, streets, sidewalks and road supplies). Plant: pavers, rollers, cold planers and marking machines from the owned fleet.
| Project | Works | Our period |
|---|---|---|
| Golf Plateau Early Works | Earthworks and early works | 2025–2026 |
| Southern Plots Road Network, Package 1 | Road network | 2025–2026 |
| Al-Dorrah bridges | Bridges | 2024–2025 |
Send us the tender documents or pre-qualification request, and our bids team will respond within two working days.