SCADA, PLC and control systems

Control you can see, from the field to the screen.

An operator at the control system screens
Representative photo

We build, programme and commission control systems for power, water and industrial plants: PLC and RTU panels, SCADA and HMI, substation automation, instrumentation and field wiring, industrial networks, and integration with the systems already in place.

Scope

  • PLC and RTU control panels
  • SCADA servers, HMI and control rooms
  • Substation automation and protection integration
  • Instrumentation, field devices and wiring
  • Industrial networks and communications
  • Programming, FAT, SAT and commissioning

Test and commissioning equipment

All electromechanical works

How we deliver

Plan before we start, inspect before we hand over: each stage is inspected, signed and closed out before the next one starts.
  1. Design review and value engineering

  2. Shop drawings and material submittals

  3. Installation, inspected to the ITP

  4. Programming, FAT, SAT and commissioning

  5. Integration with the systems already in place

  6. O&M manuals, training and handover

In pictures

  • A control room with monitoring screens
    A control room with monitoring screensRepresentative photo
  • Operators in a control room
    Operators in a control roomRepresentative photo
  • A control and monitoring hall
    A control and monitoring hallRepresentative photo
  • A plant control room
    A plant control roomRepresentative photo
  • A control panel with PLC modules
    A control panel with PLC modulesRepresentative photo
  • An automation control panel
    An automation control panelRepresentative photo

Have a project out to tender?

Send us the tender documents or pre-qualification request, and our bids team will respond within two working days.