Fit-out & Finishing

Building Systems & Finishing Sector 7

The details everyone sees.

We finish buildings inside and out: doors, windows, handrails, staircases and kitchens in timber, aluminium and metal; ceilings, partitions and wall cladding; ceramics, marble, stone, roof tiles and parquet; plastering, glazing and tower curtain walls. Shades and screens, décor, furniture installation and shop fit-out complete the work, followed by post-construction cleaning so each building is handed over ready for use.

Illustrative model, not an executed project.

What we do

  • Doors, windows, stairs and kitchens

    Doors, windows, frames, handrails, staircases and kitchens in timber, aluminium and metal.

  • Ceilings, partitions and walls

    Interior ceilings and partitions, timber wall cladding, plastering and rendering.

  • Floors and stone

    Ceramic tiles, marble, stone, roof tiles and parquet, with tile and marble grinding and polishing.

  • Glass and façades

    Glass and mirrors for buildings, and tower façade glazing.

  • Décor, shades and screens

    Decorative works, decorating and wallpapering, and shades and screens.

  • Interior fit-out and furniture

    Interior fit-out of shops, mobile buildings and boats, and furniture installation.

  • Post-construction cleaning

    Cleaning of new buildings after construction, so they are handed over ready for use.

Licensed activities 20 activities

  • Building finishing works
  • Installation of timber doors, windows, door frames and architraves, handrails, staircases and kitchens
  • Installation of aluminium doors, windows, door frames and architraves, handrails, staircases and kitchens
  • Installation of metal doors, windows, door frames and architraves, handrails, staircases and kitchens
  • Installation of shades and screens
  • Installation of interior ceilings and partitions, and timber wall cladding
  • Ceramic and tile installation
  • Marble installation
  • Stone installation
  • Roof tile installation
  • Tile and marble grinding and polishing
  • Parquet flooring
  • Decorative works and installation
  • Decorating and wallpapering
  • Plastering and rendering
  • Installation of glass and mirrors in buildings
  • Installation of tower façade glazing (curtain walls)
  • Post-construction cleaning of new buildings
  • Interior fit-out of shops, mobile buildings and boats
  • Furniture installation

Why Rakez

  • Samples approved before work

    We submit samples and mock-ups for approval before work begins, so there are no surprises at handover.

  • Snags closed item by item

    We work through the snag list until the last item is closed.

  • A clean building at handover

    Post-construction cleaning is within our scope, so the client receives a building ready to use from day one.

Have a project out to tender?

Send us the tender documents or pre-qualification request, and our bids team will respond within two working days.