KAIA critical power

Our role: subcontractor to Al Qimam Contractors Company, since 2025.

A diesel generator in its room
Representative photo

At King Abdulaziz International Airport we work on the systems that keep a 24-hour airport powered: replacing low-voltage switchgear without interrupting operations, and installing, integrating and load-testing high-capacity backup diesel generators.

Owner
GACA (General Authority of Civil Aviation)
Main contractor
SBG
Status
Ongoing
Our role
Subcontractor to Al Qimam Contractors Company, since 2025

Stages of work

  1. LV switchgear and busbar replacement

  2. Generator installation and integration

  3. Load testing and redundancy checks

  4. Testing, commissioning, energisation

Instruments we own for this work

We test loads, insulation and protection with our own instruments, including Avtron and Simplex load banks and OMICRON relay test sets.

Test and commissioning equipment

Contract values and the parties' logos are not shown. The photo on this page is representative.