Our role: subcontractor to Al Qimam Contractors Company, since 2025.

At King Abdulaziz International Airport we work on the systems that keep a 24-hour airport powered: replacing low-voltage switchgear without interrupting operations, and installing, integrating and load-testing high-capacity backup diesel generators.
LV switchgear and busbar replacement
Generator installation and integration
Load testing and redundancy checks
Testing, commissioning, energisation
We test loads, insulation and protection with our own instruments, including Avtron and Simplex load banks and OMICRON relay test sets.
Test and commissioning equipmentContract values and the parties' logos are not shown. The photo on this page is representative.